1635 Wharton St
Status
Sold
Sold Price
$620,000
Project Type
Townhome
Project Area
2,400 Sq. Ft.
Closed on
July 28, 2023

Project description
This restored historic townhouse at 1635 Wharton Street combines classic Philadelphia architectural character with thoughtful interior design. Originally built in 1915, the 2,400 sq ft property features four spacious bedrooms and 2.5 baths across three levels, including a finished basement providing flexible living space.
The interior highlights include exposed brick accent walls, custom millwork, and premium finishes that elevate everyday living. The well-appointed kitchen blends wood and marble elements with high-end appliances, while upper-level bedrooms and bathrooms showcase tailored tile work and designer fixtures. Located in the vibrant Newbold neighborhood, this residence reflects a timeless aesthetic with modern functionality.
Key Details
- Location: Newbold / Point Breeze, Philadelphia.
- Bedrooms & Baths: 4 bedrooms, 2.5 bathrooms.
- Property Type: Historic 1915 Philadelphia townhouse.
- Living Area: 2,400 sq. ft. across three levels.
- Lot Size: Approx. 1,120 sq. ft. (16 × 70).
- Finished Basement: Additional flexible living space.
Highlights & features
Architectural Character
Preserved historic elements blended with modern design.
Exposed Brick Accents
Original detailing adds warmth and authentic Philadelphia charm.
Designer Kitchen
Premium appliances, custom cabinetry, and refined finishes.
Finished Basement
Flexible bonus space for office, media room, or guest suite.
Updated Bathrooms
Contemporary tile work and upgraded fixtures.
Spacious Multi-Level Layout
Thoughtfully designed flow across three full levels.
Central Heating & Cooling
Year-round climate comfort and efficiency.
Prime Walkable Location
Close to dining, cafes, transit, and neighborhood amenities.
Media
Location
address
1635 Wharton St Philadelphia, PA 19146
Key transport
Subway station
0.7 mi
Supermarket
0.4 mi
Railway station
1.8 mi
Bus station
0.1 mi
Hospital
2.6 mi
University
1.1 mi
Park
0.3 mi
Airport
8.8 mi